Ref. No. 24MEE011Aa

Reopening of the Rhône Right Bank line to SNCF passenger services

Water law section of the Environmental Authorisation File

As part of the project to reopen the RdR line to passenger service (9 stations, 2 departments), SNCF has entrusted ABO-ERG ENVIRONNEMENT with the implementation of the water law component of the project's Environmental Authorisation File.
ABO ERG first established the regulatory framework for the project and assessed its main challenges in terms of the water component of the EIA. A meeting with the DDTM then confirmed the technical and regulatory aspects of the project.
The product file (sections 2.1.5.0 and 3.2.2.0) also aimed to justify the prior existence of the stations with regard to Article R.214-53 of the Environment Code, to determine the size of the rainwater management structures and to study the impact of the planned developments on the flood risk in the areas.
Finally, ABO ERG assists the project owner in responding to requests for additional information from the DDTM during the review of the application.

Agency:

Marseille

Date of completion:

• 2024-Ongoing
Amount excluding VAT:
• €31,000

Place of production:

• Gard (30), Ardèche (07)

Type of mission according to standard 94500:

Work completed:

• Water law section

Relevant qualifications:

Mission details:

• Site visits and soil permeability testing
• Study of the environmental context
• Regulatory framework
• Analysis of study sites in terms of prior use
• Drafting of the section on water law
ERG equipment used:
• GIS software: QGIS
Solutions provided by ABO ERG Environnement :
Water law section of the DAE. Sizing of rainwater management structures. Analysis of the impact on flood risk.
Project owner:
French National Railway Company

Our references

> Home / our references / Ref. 24MEE011Aa
Ref. No. 24MEE011Aa

Reopening of the Rhône Right Bank line to SNCF passenger services

Water law section of the Environmental Authorisation File

As part of the project to reopen the RdR line to passenger service (9 stations, 2 departments), SNCF has entrusted ABO-ERG ENVIRONNEMENT with the implementation of the water law component of the project's Environmental Authorisation File.
ABO ERG first established the regulatory framework for the project and assessed its main challenges in terms of the water component of the EIA. A meeting with the DDTM then confirmed the technical and regulatory aspects of the project.
The product file (sections 2.1.5.0 and 3.2.2.0) also aimed to justify the prior existence of the stations with regard to Article R.214-53 of the Environment Code, to determine the size of the rainwater management structures and to study the impact of the planned developments on the flood risk in the areas.
Finally, ABO ERG assists the project owner in responding to requests for additional information from the DDTM during the review of the application.

Agency:

Marseille

Date of completion:

• 2024-Ongoing

Amount excluding VAT:

• €31,000

Place of production:

• Gard (30), Ardèche (07)

Type of mission according to standard 94500:

Work completed:

• Water law section

Relevant qualifications:

Mission details:

• Site visits and soil permeability testing
• Study of the environmental context
• Regulatory framework
• Analysis of study sites in terms of prior use
• Drafting of the section on water law
ERG equipment used:
• GIS software: QGIS
Solutions provided by ABO ERG Environnement :
Water law section of the DAE. Sizing of rainwater management structures. Analysis of the impact on flood risk.
Project owner: French National Railway Company