Ref. No. 16MG147Ac

Operation «Les Terrasses de la Villette»

Project to construct three buildings with two basement levels

Pre-dimensioning of shielding screen (micro-Berlinese) and foundations (raft foundation)

Pre-dimensioning of a retaining structure

Project:

The project under consideration consists of the construction of three six- to seven-storey buildings that will house shops, housing and offices. They will be built on two levels of generalised basements.

Geotechnical investigations:

As part of the G2AVP study, the following geotechnical surveys were carried out:
– Core drilling to a depth of 15 metres,
– Pressuremeter surveys to a depth of 20.0 metres,
– Permeability tests,
– Laboratory tests: identification tests, compression tests.

Geotechnical and hydrogeological context:

Surveys have revealed the presence of embankments up to 3.0 m high resting on compact bedrock (Stampian formations).
A hydrogeological study was also carried out by ABO-ERG Géotechnique, highlighting the presence of groundwater within the local bedrock.

Identified geotechnical issues:

– Construction site in town, with neighbouring properties: light roadworks, buildings
– Groundwater,
– Maximum earthworks height of 9.5 m.

Dimensioned geotechnical structures:

– Construction of a discontinuous, load-bearing, permanent micro-Berlin wall, with temporary pumping devices.
– Construction, in the final phase, of a raft foundation to absorb the negative pressure and installation of micropile anchors beneath the raft foundation to absorb these forces.

Agency:

Marseille

Date of completion:

• March 2024
Amount excluding VAT:
• ≤ €5,000

Place of production:

• MARSEILLE (13)
Type of mission according to standard 94500:
• G2 PRO

Work completed:

Relevant qualifications:

• 1002/1106/1008/1233

Mission details:

• Pre-dimensioning of a permanent load-bearing peripheral support structure according to two profiles
• Study of a sub-pressure raft foundation
• Justification for micro-pile anchoring
Calculation software:
• K-REA for retaining wall calculations
• FOXTA for pile pre-dimensioning

Solutions provided by:

Pre-dimensioning of a Berlin-type diaphragm wall, with temporary pumping devices and a raft foundation to absorb negative pressure in the final phase (using micropiles).
Project owner:
1001 LIVES HABITAT

Our references

> Home / our references / Ref. 16MG147Ac
Ref. No. 16MG147Ac

Operation «Les Terrasses de la Villette»

Project to construct three buildings with two basement levels

Pre-dimensioning of shielding screen (micro-Berlinese) and foundations (raft foundation)

Pre-dimensioning of a retaining structure

Project:

The project under consideration consists of the construction of three six- to seven-storey buildings that will house shops, housing and offices. They will be built on two levels of generalised basements.

Geotechnical investigations:

As part of the G2AVP study, the following geotechnical surveys were carried out:
– Core drilling to a depth of 15 metres,
– Pressuremeter surveys to a depth of 20.0 metres,
– Permeability tests,
– Laboratory tests: identification tests, compression tests.

Geotechnical and hydrogeological context:

Surveys have revealed the presence of embankments up to 3.0 m high resting on compact bedrock (Stampian formations).
A hydrogeological study was also carried out by ABO-ERG Géotechnique, highlighting the presence of groundwater within the local bedrock.

Identified geotechnical issues:

– Construction site in town, with neighbouring properties: light roadworks, buildings
– Groundwater,
– Maximum earthworks height of 9.5 m.

Dimensioned geotechnical structures:

– Construction of a discontinuous, load-bearing, permanent micro-Berlin wall, with temporary pumping devices.
– Construction, in the final phase, of a raft foundation to absorb the negative pressure and installation of micropile anchors beneath the raft foundation to absorb these forces.

Agency:

Marseille

Date of completion:

• March 2024

Amount excluding VAT:

• ≤ €5,000

Place of production:

• MARSEILLE (13)

Type of mission according to standard 94500:

• G2 PRO

Work completed:

Relevant qualifications:

• 1002/1106/1008/1233

Mission details:

• Pre-dimensioning of a permanent load-bearing peripheral support structure according to two profiles
• Study of a sub-pressure raft foundation
• Justification for micro-pile anchoring
Calculation software:
• K-REA for retaining wall calculations
• FOXTA for pile pre-dimensioning
Solutions provided by ABO ERG Géotechnique :
Pre-dimensioning of a Berlin-type diaphragm wall, with temporary pumping devices and a raft foundation to absorb negative pressure in the final phase (using micropiles).
Project owner: 1001 LIVES HABITAT