Ref. No. 15SG180Ad to Ae

Frontage overlooking the Les Roches Rouges condominium in SANARY sur MER

Project management for reinforcement works

produced by ABO ERG

Bid analysis report, work monitoring

ABO-ERG first carried out an assessment and then designed a plan for the condominium. Following a landslide, the expert appointed by the administrative court commissioned ABO-ERG to adapt the design to the land constraints.
Ultimately, the town hall was ordered to carry out the work at its own expense for safety reasons, and entrusted ABO-ERG with project management of the work.
The key point in this case was to find solutions to shorten the anchors so as not to encroach on the dominant properties, which are separated from the cliff by a municipal road.

Agency:

LA SEYNE

Date of completion:

• From 2023 to 2024
Amount excluding VAT:
• €7.4k

Place of production:

• SANARY/MER (83)
Type of mission according to standard 94500:
• G2 ACT then G4

Work completed:

• RAO then supervision

Relevant qualifications:

• 1003

Mission details:

• Rope measurements
• Establishment of G5 diagnosis, then design
• A court-appointed expert will request that the anchors be shortened to comply with property boundaries.
• New design and establishment of DCE parts
• RAO
Calculation software:
• Swedge
• Spreadsheets developed in-house

Solutions provided by:

Shotcrete limited to what is strictly necessary – short anchors
Project owner:
Town of SANARY sur MER
Project manager:
ERG Geotechnics
Construction company:
TETRA

Our references

> Home / our references / Ref. 15SG180Ad to Ae
Ref. No. 15SG180Ad to Ae

Frontage overlooking the Les Roches Rouges condominium in SANARY sur MER

Project management for reinforcement works

produced by ABO ERG

Bid analysis report, work monitoring

ABO-ERG first carried out an assessment and then designed a plan for the condominium. Following a landslide, the expert appointed by the administrative court commissioned ABO-ERG to adapt the design to the land constraints.
Ultimately, the town hall was ordered to carry out the work at its own expense for safety reasons, and entrusted ABO-ERG with project management of the work.
The key point in this case was to find solutions to shorten the anchors so as not to encroach on the dominant properties, which are separated from the cliff by a municipal road.

Agency:

LA SEYNE

Date of completion:

• From 2023 to 2024

Amount excluding VAT:

• €7.4k

Place of production:

• SANARY/MER (83)

Type of mission according to standard 94500:

• G2 ACT then G4

Work completed:

• RAO then supervision

Relevant qualifications:

• 1003

Mission details:

• Rope measurements
• Establishment of G5 diagnosis, then design
• A court-appointed expert will request that the anchors be shortened to comply with property boundaries.
• New design and establishment of DCE parts
• RAO
Calculation software:
• Swedge
• Spreadsheets developed in-house
Solutions provided by ABO ERG Géotechnique :
Shotcrete limited to what is strictly necessary – short anchors
Project owner: Town of SANARY sur MER
Project manager: ERG Geotechnics
Construction company: TETRA